How do I prepare my basement for DRYLOK?
DRYLOK paint should only be applied after you prep walls by cleaning them with a wire brush, removing salt deposits and sealing cracks and holes. Paint the walls when the temperature is at least 50 degrees Fahrenheit, optimally during a rain-free period when humidity levels are not high.
Does wall need to be dry to apply DRYLOK?
Make sure the wall has dried completely before applying any DRYLOK. You’ll also want to make sure that old paint is removed by sand-blasting or by other suitable means. Keep in mind that DRYLOK can be used on top of any other cementitious-type waterproofing paint that is in good condition.
Can you put DRYLOK on with a roller?
If you prefer to use a roller, be sure to back brush the first coat to make sure DRYLOK® penetrates those pores and pinholes. Apply coat number two using your choice of a roller, brush, or sprayer. A minimum of 2 coats is required for the fully transferable warranty to apply.
Does DRYLOK need 2 coats?
Two coats of DRYLOK® Original Basement & Masonry Waterproofer are required to assure warranted waterproofing.
Can you use DRYLOK over old DRYLOK?
DRYLOK is not warranted when used over previously painted surfaces or on horizontal surfaces. DRYLOK EXTREME may be applied over surface previously painted with Latex Base DRYLOK Masonry Waterproofer or Oil Base DRYLOK Masonry Waterproofer.
How long does DRYLOK take to dry?
2-3 hours
Dry time: 2-3 hours. Coats: minimum of 2 for Warranty Coverage. Recoat time: 2-3 hours. Optional: After 24 hours, DRYLOK® Original Masonry Waterproofer may be topcoated with a good quality latex paint for decorative purposes.
How effective is DRYLOK?
The UGL Drylok Extreme system is guaranteed to work for up to 15 feet of head or water pressure and for up to 15 years. It is not a crystalline system—it’s more paint-like—although the manufacturer states that it does penetrate the concrete. I applied two coats as required in the installation instructions.
Does DRYLOK really work?
The UGL Drylok Extreme system is guaranteed to work for up to 15 feet of head or water pressure and for up to 15 years. It is not a crystalline system—it’s more paint-like—although the manufacturer states that it does penetrate the concrete. A double-coating of UGL Drylok Extreme that still weeps water.
How many coats of DRYLOK do you need?
2 coats
Proper coverage, a minimum of 2 coats, is required to warranty waterproofing. After the second coat, carefully inspect the entire surface for pinholes. Give these areas an additional coat. If leaking is still present after 2 coats, it indicates that pores or pinholes are still open.
How to apply drylock step by step guide?
How To Apply DRYLOCK. 1 Step 1: Prepare The Surface And Work Area. Prior to beginning any prep, slip-on safety eyewear as well as a face mask to protect your eyes and 2 Step 2: Seal Holes And Joints Using DRYLOK Fast Plug. 3 Step 3: Begin Applying DRYLOK Masonry WaterProofer To The Walls. 4 Step 4: Applying The Second And Final Coat Of DRYLOK.
How long does it take to dry drylok masonry?
After three hours, the first coat will be dry. Apply coat number two using your choice of a roller, brush, or sprayer. A minimum of 2 coats is required for the fully transferable warranty to apply.
How many coats of drylok do you need?
Apply coat number two using your choice of a roller, brush, or sprayer. A minimum of 2 coats is required for the fully transferable warranty to apply. Now, inspect the surface for any remaining pinholes and fill them in. If it still leaks, a random pore or pinhole is still open. Find it and fill it.
What kind of brush do you use to apply drylok?
The viscosity of the formula is your friend. First off, make sure you’re using a three-quarter-inch nap roller or paint brush specifically designed to work with heavy-bodied paint (like the DRYLOK ® Brush ). Second, follow the directions, starting with stirring the product before and during application. Scheduling your project?